Langsung ke konten utama

Postingan

Menampilkan postingan dengan label measurement

Measurement is critical to Improvement

Changes made in the context of improvement; it would seem of no use if it can not be measured accurately. Measurements here do not have the sophisticated equipment, but with simple techniques and tools that already exist, such as stop watch to measure the change in the time before and after improvement. Measurement of improvement will show us how effective the changes we have made. It also gives an overview that describes the variables that affect process performance. To give an idea can be visually indicated by the line graph, run chart or control chart. Graphs and pictures shown, will help usto understand trends, and gaps for further improvement. In addition it will provide the image data needed for improvement of work. After all measurement performed and obtain the necessary data, and has been visualized in the form of graphs and charts. Then the next step is to assess whether there are significant differences to the changes that have been made. Is the quality improved after the cha

Juran's Quality Trilogy: Providing the Needs for Improvement

In Juran’s Quality Trilogy, is the second point is the quality improvement. Improvement is an important activity in manufacturing. For that we need the support of all parties. The Company will not be able to compete if it does not make improvement. To get the best product quality can not be achieved by means of instant, but the improvement done in stages. The things most important improvement is the participation of all components of the company. Improvement projects should be supported fully. It should also be done by the ranks of top management. Top management has the power to decide everything about the company’s policy will be crucial, especially in the provision needs improvement