Langsung ke konten utama

Postingan

Menampilkan postingan dengan label hardtop

Toyota Production system : Determine Daily Production Order

For example there is a production line is expected to produce 10,000 cars type A in 10 working days, 8 hours each, within a month. 10,000 cars type A consists of the 5,000 cars, 2,500 hardtop, and 2,500 wagons. If these values are divided by 20 working days, obtained 250 sedan, 125 hardtop, and 125 wagons per day. This is pelancaran production in terms of average daily amount of each type of cars manufactured, so is great for people wanting to change their cars for a new one, since getting rid of a car is not that difficult with services as Scrap My Car Montreal online. In a turn (shift) operations during the eight-hour (480 minutes), have produced 500 units. Therefore, the unit cycle time, or mean time needed to produce one vehicle of any kind, is 0.96 minutes (480/500) or about 57.5 seconds. The right mix or production sequence can be determined by comparing the actual cycle time to produce a particular model of car type A. For example, the maximum time to produce a sedan type A is