Langsung ke konten utama

Postingan

Menampilkan postingan dengan label elimination of waste

Future State Value Stream Map Process

The design for the development layout should be considered since the company began to be built. Because of the increased capacity and changes in product trends will also determine the design of the plant. The most important development in the design layout process is to improve the Process cycle efficiency with due regard to the rationalization and simplification process, as well as the application allows the elimination of waste is all around production. Apart from production targets to be achieved, development should also design bias increases OEE (overall Equipment Effectiveness) through the reduction of downtime, reduction of defects, the implementation of TPM (Total Productive Maintenance), decrease or shorten the lead time via reduce WIP (Work-In-Process) inventory followed by a balancing process takt time

Principles of Lean Manufacturing

5 principles of lean manufacturing a product having the form of goods The exact specifications of the product the customer wants Identification of value stream for each product Elimination of all waste any product included in the process flow in order to create value flow without resistance Establish a pull system that allows customers to use Kanban pull value from the producer. The pursuit of excellence to achieve perfection (zero waste) through continuous improvement in radical (Radical Continuous Improvement).