Obviously, the path length in the process of moving goods manufacturing system is very disturbing, therefore, the company tried to minimize the transport distance from one place to another place. Distance delivery is highly dependent on such things as follows:

Factory Layout
Plant layout should be made with ripe at the time of the original factory design. One of them is based on the efficiency of the transport of material from the loading bay to the store, from store to production areas, from process to process, from production process to finished good stores and so forth.
Plant layout should be designed in accordance with the transportation needs, facilitate movement of workers, facilitate the installation of electricity, compressed air installations, and plant efficiency

5S in chaotic conditions
If the design had to follow the rules of efficiency and effectiveness of manufacturing, the next is 5S conditions that must be made as neat as possible and not interfere with work. Usually 5S condition is what causes the problem. If under normal circumstances, only 30 meters distance because of the piles that block the road only have to play with greater distance.

Cases like these that must be resolved so that the material removal is quick and easy. Long mileage that can adversely affect the company. Again 5S play an important role in terms of eliminating waste in manufacturing, especially carrying waste caused by the mileage even further.